Development
of an individual quality
home, constructed
in timber frame in
Abbotsley, Cambs. <Back to Case Study
main page The house
was constructed
to a very high standard
and completed within
20 weeks.
The design for
the house and
landscaping
was created
by our internal
Architecture
team in consultation
with the local
planners.